The Epoxcen process
is applied in the same fashion as the Centriline process; the pipeline is cleaned using
the same techniques.
The lining
thickness is regulated by the speed of travel through the pipeline. The lining can be
applied in thickness from 1 to 5 millimetres.
The lining improves hydraulic capacity and has no adverse effect on the quality of the
conveyed water.
The Epoxcen Process is approved by the United Kingdom Department of Environment for use
in public water supply systems. |